AL
Construction & infrastructure
Cancelled
Negotiated procedure
Contract notice
Repair and maintenance of the electrical and IT network system, as well as the hydraulic and sanitary network, for the MBZHR year 2026.
Riparim dhe mirëmbajtje e sistemit të rrjetit elektrik & IT -së si dhe rrjetit hidraulik & hidrosanitar për vitin 2026 të MBZHR-së— source language
Contracting authority:
Ministria e Bujqesise dhe Zhvillimit Rural
Estimated value
Not stated
original currency: ALL
Submission deadline
Not stated
Description
No description in the source listing payload. Open the official portal for the full notice.
Details
- Notice type
- Contract notice
- Size bucket
- Below threshold — exempt
- Published
- 2026-05-07 00:00 UTC
- External ID
- al_app-REF-84626-05-07-2026
- Place of performance
- —
- CPV codes
- 43328000 — Hydraulic installations.
- Procedure
- Negotiated procedure
- Source
- app.gov.al
Source provenance — which portal, which payload, when fetched
Source portalapp.gov.al
Notice URL/small-value-procurements/
Payload SHA-256de48a5a2c0fa…56773b
First seen2026-05-07 10:12 UTC
Last refreshed2026-05-07 10:12 UTC (1 month ago)
Polling interval360 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
4 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
4 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
16 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
18 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
7 days left