BA
Construction & infrastructure
Cancelled
Negotiated procedure
Contract notice
Procurement of spare parts for the central heating plant for the needs of the Neretva Hydroelectric Power Plant Branch, Jablanica
Nabavka rezervnih dijelova za kotlovnicu centralnog grijanja za potrebe Podružnice Hidroelektrane na Neretvi, Jablanica— source language
Contracting authority:
HIDROELEKTRANE NA NERETVI, JABLANICA
· Kako je dato u tenderskoj dokumentaciji., Bosnia and Herzegovina
Estimated value
€8,500
≈ EUR 8,500 · original currency: BAM 8,500
Submission deadline
2026-05-22 09:30 UTC
closed 44 days ago
Description
Procurement of spare parts for the central heating plant for the needs of the Neretva Hydroelectric Power Plant Branch, Jablanica
Show source language
Nabavka rezervnih dijelova za kotlovnicu centralnog grijanja za potrebe Podružnice Hidroelektrane na Neretvi, Jablanica
Details
- Notice type
- Contract notice
- Size bucket
- Small — below threshold
- Published
- 2026-05-06 09:47 UTC
- External ID
- ba_ejn-procedure-2695293
- Place of performance
- Kako je dato u tenderskoj dokumentaciji.
- Procedure
- Negotiated procedure
- Source
- next.ejn.gov.ba
Source provenance — which portal, which payload, when fetched
Source portalnext.ejn.gov.ba
Notice URL/en/procedures/2695293/overview
Payload SHA-25604da04c7303c…404832
First seen2026-05-06 10:00 UTC
Last refreshed2026-05-06 10:00 UTC (1 month ago)
Polling interval60 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
4 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
4 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
16 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
18 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
7 days left