MK
Construction & infrastructure
Consulting & professional services
Cancelled
Open procedure
Contract notice
Maintenance of high-voltage equipment (Energy)
Održuvanje na visokonaponska oprema (Energetika)— source language
Одржување на високонапонска опрема (Енергетика)— original
Contracting authority:
Akcionersko društvo za proizvodstvo na električna energija ELEKTRANI NA SEVERNA MAKEDONIJA, vo državna sopstvenost, Skopje
Estimated value
Not stated
original currency: MKD
Submission deadline
2026-07-16 07:30 UTC
11 days left
Description
No description in the source listing payload. Open the official portal for the full notice.
Details
- Notice type
- Contract notice
- Size bucket
- Framework / DPS
- Published
- 2026-06-15 12:08 UTC
- External ID
- mk_enabavki-80bc5022-743e-4f3f-9270-1b6251888fc8
- Place of performance
- —
- Procedure
- Open procedure
- Source
- e-nabavki.gov.mk
Source provenance — which portal, which payload, when fetched
Source portale-nabavki.gov.mk
Notice URL/PublicAccess/home.aspx#/dossie/80bc5022-743e-4f3f-9270-1b6251888fc8/1
Payload SHA-256e9fcd76f4f13…0166c4
First seen2026-06-16 21:10 UTC
Last refreshed2026-06-16 21:10 UTC (2 weeks ago)
Polling interval360 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
4 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
4 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
16 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
18 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
7 days left