BA
Construction & infrastructure
Awarded
Negotiated procedure
Contract award
Renovation of housing units for Roma families from the municipality of Vlasenica
Sanacija stambenih jedinica Romskih porodica sa područja opštine Vlasenica— source language
Санација стамбених јединица Ромских породица са подручја општине Власеница— original
Contracting authority:
OPŠTINA VLASENICA
· VLASENICA, Bosnia and Herzegovina
Estimated value
Not stated
original currency: BAM
Submission deadline
Not stated
Description
No description in the source listing payload. Open the official portal for the full notice.
Details
- Notice type
- Contract award
- Size bucket
- Small — below threshold
- Published
- 2026-07-01 06:27 UTC
- External ID
- ba_ejn-award-171843
- Place of performance
- VLASENICA
- CPV codes
- —
- Procedure
- Negotiated procedure
- Source
- next.ejn.gov.ba
Source provenance — which portal, which payload, when fetched
Source portalnext.ejn.gov.ba
Notice URL/en/award-notices
Payload SHA-25685dea2ab1973…3e9ac6
First seen2026-07-01 08:00 UTC
Last refreshed2026-07-01 08:00 UTC (4 days ago)
Polling interval60 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
4 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
4 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
16 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
18 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
7 days left