Implementation of works on the water supply for the settlements of Poturovići and Ljubina in the municipality of Vogošća – Phase IV (construction of the distribution and transport pipeline)
The subject of the procurement is the IVth phase of the project's implementation, namely the execution of works on the reconstruction and laying of a pipeline with a length of approximately 1560 m, DN 100 mm profile, and around 50 connections. Of this, the following works are to be carried out: • Secondary pipeline 4 from the Vogošća Donja reservoir, section 225.00 m; • Transport pipeline from point T94 to point T109 to point T137, 533.00 m; • Distribution pipeline from the Poturovići Reservoir from point T137 to consumption point T246 over a length of 803 m; In previous phases, the pumping station and the 'Poturovići' Reservoir were constructed. and the existing pipeline was reconstructed, the pressure and relief mains laid, and part of the distribution pipeline, which is supplied from the Vogošća Donja reservoir, and part of the transport pipeline up to point T109 were reconstructed and constructed. With the continuation of the implementation of the water supply project for the settlements of Poturovići and Ljubina in the municipality of Vogošća, the upper part of the Ljubina settlement would be supplied with water, thereby creating the conditions for the construction of a distribution pipeline for the Ljubina settlement, which would ensure water for all residents of the Ljubina settlement. The works will be carried out in accordance with the Main Project for the Water Supply of the settlements of Poturovići and Ljubina in the municipality of Vogošća – Book 1 – Pipe Network, prepared by the design firm "Zavod za vodoprivredu" d.d. Sarajevo.
Show source language
Predmet nabavke je IVI faza realizacije projekta, odnosno izvođenja radova na rekonstrukciji i polaganju cjevovoda u dužini od cca 1560 m profila DN 100mmi oko 50 priključaka. Od toga se izvode: • Sekundarni cjevovod 4 iz rezervoara Vogošća Donja dio u dužini 225,00 m; • Transportni cjevovod od tačke T94 do tačke T109 do tačke T137 u dužini 533,00 m; • Distributivni cjevovod iz rezervoara Poturovići od tačke T137 do centra potrošnje T246 u dužini od 803 m; U prethodnim fazama izgrađena je pumpna stanica i rezervoar „Poturovići“ te je rekonstruisan postojeći cjevovod, položen potisni i ispusni cjevovod, rekonstruisan i izgrađen dio distributivnog cjevovoda koji se snabdijeva iz rezervoara Vogošća Donja i dio transportnog cjevovodado tačke T109. Nastavkom realizacije projekta vodosnabdijevanja naselja Poturovići i Ljubina na području općine Vogošća, vodom bi se snabdio vrh naselja Ljubina i time bi se stvorili uslovi za izgradnju distributivnog cjevovoda za naselje Ljubina čime bi se obezbijedila voda za sve stanovnike naselja Ljubina. Radovi će se izvoditi prema Glavnom projektu vodosnabdijevanja naselja Poturovići i Ljubina na području općine Vogošća – knjiga 1 – cjevovod, izrađenom od strane projektantske kuće „Zavod za vodoprivredu“ d.d. Sarajevo.
- Notice type
- Contract notice
- Size bucket
- Small — below threshold
- Published
- 2026-04-30 12:14 UTC
- External ID
- ba_ejn-procedure-2693089
- Place of performance
- područje općine Vogošća (naselja Poturovići i Ljubina)
- CPV codes
- 45231112 — Installation of pipe system.
- Procedure
- Open procedure
- Source
- next.ejn.gov.ba