BA
Construction & infrastructure
Awarded
Open procedure
Contract award
Repair of a leak at the Klek tunnel closure – CHE Čapljina
Sanacija procurivanja na zatvaraču tunela Klek – CHE Čapljina— source language
Contracting authority:
JP ELEKTROPRIVREDA HRVATSKE ZAJEDNICE HERCEG BOSNE D.D. MOSTAR
· JP Elektroprivreda HZ HB d.d. Mostar - Proizvodnja električne energije - CHE Čapljina, Bosnia and Herzegovina
Estimated value
€29,830
≈ EUR 29,830 · original currency: BAM 29,830
Submission deadline
2026-03-09 10:30 UTC
closed 118 days ago
Description
Repair of a leak at the Klek tunnel closure – CHE Čapljina
Show source language
Sanacija procurivanja na zatvaraču tunela Klek – CHE Čapljina
Details
- Notice type
- Contract award
- Size bucket
- Small — below threshold
- Published
- 2026-05-15 12:54 UTC
- External ID
- ba_ejn-procedure-2646198
- Place of performance
- JP Elektroprivreda HZ HB d.d. Mostar - Proizvodnja električne energije - CHE Čapljina
- Procedure
- Open procedure
- Source
- next.ejn.gov.ba
Source provenance — which portal, which payload, when fetched
Source portalnext.ejn.gov.ba
Notice URL/en/procedures/2646198/overview
Payload SHA-256e76c0afeafc1…8e60ce
First seen2026-05-15 14:00 UTC
Last refreshed2026-05-18 04:00 UTC (1 month ago)
Polling interval60 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
4 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
4 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
16 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
18 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
7 days left