Flood defence works on water protection facilities owned by the Federation of Bosnia and Herzegovina in the Central Posavina area for the period 2027-2029.
The subject of this public procurement procedure is the procurement of works – the subject of the procurement is the execution of flood defence works on protective water facilities owned by the Federation of Bosnia and Herzegovina in the area of Central Posavina in accordance with the provisions of the Regulation on Flood Defence Plans ("Official Gazette of the Federation of Bosnia and Herzegovina", No. 26/09) and the Federal Operational Plan for Flood Defence ("Official Gazette of the Federation of Bosnia and Herzegovina", No. 97/15). The flood defence phases provide for: - preparatory measures and works - operational defence activities - final measures and works The facilities on which works are being carried out are: - Pumping stations: «TOLISA» (Tolisa settlement), - Guardhouse «Grebnice», «Kopanice», «Tolisa», - Flood Defence Centre «Orašje», - Embankment: Sava flood defence embankment «Osatno – Bosanski Šamac» and - the «Hazna» and «Vidara» embankments in Gradačac Phases of flood defence include: - For preparatory measures and works: routine maintenance of constructed water facilities and installations, management and monitoring of the condition of constructed protective structures and installations, enhanced routine maintenance - repair of damaged water facilities, storage and maintenance of flood defence equipment, etc. - For operational defence activities: during periods of high water, issuing notifications and warnings to the relevant authorities, organising and managing the flood defence system, and carrying out immediate flood defence operations. - For final measures and works: repair of damaged water structures of the flood defence system, preparation of reports, replenishing stocks with defence equipment and materials, etc.
Prikaži izvorni jezik
Predmet ovog postupka javne nabavke je nabavka radova – Predmet nabavke je vršenje radova odbrane od poplava na zaštitnim vodnim objektima u vlasništvu Federacije BiH na području Srednje Posavine u skladu sa odredbama Uredbe o planovima odbrane od poplava (“Službene novine Federacije BiH”, broj 26/09) i Federalnog operativnog plana odbrane od poplava (“Službene novine Federacije BiH”, broj 97/15). Faze odbrane od poplava predviđaju: - pripremne mjere i radovi - operativne odbrambene aktivnosti - završne mjere i radovi Objekti na kojima se vrše radovi su: - Crpne stanice: «TOLISA» (naselje Tolisa), - Čuvarska kuća «Grebnice», «Kopanice», «Tolisa», - Centar odbrane od poplava «Orašje», - Nasip: savski odbrambeni nasip «Osatno – Bosanski Šamac» i - nasute brane «Hazna« i «Vidara» u Gradačcu Faze odbrane od poplava obuhvataju: - Za pripremne mjere i radove: redovno-tekuće održavanje izgrađenih vodnih objekata i postrojenja, upravljanje i kontrola stanja izgrađenih zaštitnih objekata i postrojenja, pojačano tekuće održavanje - sanacija oštećenih vodnih objekata, smještaj i održavanje odbrambene opreme i dr. - Za operativne odbrambene aktivnosti: za vrijeme velikih voda, davanje obavijesti i upozorenja odgovarajućim organima, organizacija i upravljanje sistemom za odbranu od poplava sa radom na neposrednom izvršenju odbrane od poplava. - Za završne mjere i radove: sanacija oštećenih vodnih objekata sistema odbrane od poplava, izrada izvještaja, popunjavanje zaliha odbrambenom opremom i materijalom i dr.
- Vrsta obavještenja
- Poziv za nadmetanje
- Objavljeno
- 16.10.2026 08:20
- Eksterni ID
- ba_ejn-procedure-2785059
- Postupak
- Otvoreni postupak
- Izvor
- next.ejn.gov.ba