BA
Construction & infrastructure
Cancelled
Open procedure
Contract notice
Renovation of the façade and entrance of the Power Generation business building in Tomislavgrad
Sanacija fasade i ulaza u poslovnu zgradu Proizvodnje električne energije u Tomislavgradu— source language
Contracting authority:
JP ELEKTROPRIVREDA HRVATSKE ZAJEDNICE HERCEG BOSNE D.D. MOSTAR
· Poslovna zgrada OJ PEE u Tomislavgradu, Industrijska zona Vučilov brig 15, 80 240 Tomislavgrad, Bosnia and Herzegovina
Estimated value
€99,862
≈ EUR 99,862 · original currency: BAM 99,862
Submission deadline
2026-06-16 09:30 UTC
closed 20 days ago
Description
Renovation of the façade and entrance of the Power Generation business building in Tomislavgrad
Show source language
Sanacija fasade i ulaza u poslovnu zgradu Proizvodnje električne energije u Tomislavgradu
Details
- Notice type
- Contract notice
- Size bucket
- Small — below threshold
- Published
- 2026-05-19 06:34 UTC
- External ID
- ba_ejn-procedure-2703091
- Place of performance
- Poslovna zgrada OJ PEE u Tomislavgradu, Industrijska zona Vučilov brig 15, 80 240 Tomislavgrad
- Procedure
- Open procedure
- Source
- next.ejn.gov.ba
Source provenance — which portal, which payload, when fetched
Source portalnext.ejn.gov.ba
Notice URL/en/procedures/2703091/overview
Payload SHA-256f651b77ad91f…323881
First seen2026-05-19 08:00 UTC
Last refreshed2026-05-19 08:00 UTC (1 month ago)
Polling interval60 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
3 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
3 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
15 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
17 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
6 days left