BA
Construction & infrastructure
Consulting & professional services
Cancelled
Open procedure
Contract notice
Review: Project solution optimisation – Reconstruction of the M18 road, with the construction of a third carriageway, Stupari–Vitalj section, Brlošci–Gojakovići sub-section, L = approx. 2.8 km
Revizija: Optimizacija projektnog rješenja - Rekonstrukcija ceste M18, sa izgradnjom treće trake, dionica Stupari – Vitalj, poddionica Brlošci - Gojakovići, L= cca 2,8 km— source language
Contracting authority:
JAVNO PREDUZEĆE CESTE FEDERACIJE BIH D.O.O.
· Sjedište JP Ceste F BiH d.o.o. Sarajevo, Terezija 54, Sarajevo, Bosnia and Herzegovina
Estimated value
€4,274
≈ EUR 4,274 · original currency: BAM 4,274
Submission deadline
2026-05-26 10:00 UTC
closed 41 days ago
Description
Review: Project solution optimisation – Reconstruction of the M18 road, with the construction of a third carriageway, Stupari–Vitalj section, Brlošci–Gojakovići sub-section, L = approx. 2.8 km
Show source language
Revizija: Optimizacija projektnog rješenja - Rekonstrukcija ceste M18, sa izgradnjom treće trake, dionica Stupari – Vitalj, poddionica Brlošci - Gojakovići, L= cca 2,8 km
Details
- Notice type
- Contract notice
- Size bucket
- Small — below threshold
- Published
- 2026-05-05 13:40 UTC
- External ID
- ba_ejn-procedure-2694862
- Place of performance
- Sjedište JP Ceste F BiH d.o.o. Sarajevo, Terezija 54, Sarajevo
- Procedure
- Open procedure
- Source
- next.ejn.gov.ba
Source provenance — which portal, which payload, when fetched
Source portalnext.ejn.gov.ba
Notice URL/en/procedures/2694862/overview
Payload SHA-256de8b928e8755…7742b7
First seen2026-05-05 14:00 UTC
Last refreshed2026-05-06 06:00 UTC (2 months ago)
Polling interval60 min
Schema versionOCDS 1.1 + Open Procurements v0.4
Same industry
Similar tenders
MK
North Macedonia
·
SGGU S Zdravko Cvetkovski C.O. Skopje
·
Construction & infrastructure
Reconstruction of an existing corroded steam installation line.
—
3 days left
MK
North Macedonia
·
OU Strašo Pindžur - Kavadarci
·
Construction & infrastructure
Reconstruction of facilities
—
3 days left
BA
Bosnia and Herzegovina
·
ELEKTROPRENOS - ELEKTROPRIJENOS BIH A.D.
·
Construction & infrastructure
JN-OP-878/2025 – procurement for the refurbishment of TS 110/x KV Zenica 3
JN-OP-878/2025 - Procurement of the reconstruction of the 110/x kV Zenica 3 substation, including: preparation of the
project documentation...
€8,036,124
15 days left
BA
Bosnia and Herzegovina
·
RUDNIK UGLJA "KREKA" D.O.O. TUZLA
·
Construction & infrastructure
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
Hire of a bulldozer with an engine power of N≥200 kW (100 h) for the needs of the Šikulje Plant.
€24,600
17 days left
RS
Serbia
·
SMATSA DOO, Beograd (grad)
·
Construction & infrastructure
Consumables for aviation
—
6 days left